| Upper Harbour Highway, Greenhithe |
|
| Responsible for the final design and supervision of Miragrid reinforced slopes for three culverts, up to 15m high. The wrapped face walls enable a 'green facing' in environmentally sensitive areas. Three Mechanically stabilised earth walls (MSE) up to 100m long and, in places, 7m high. |
 |
| Langsview, Whangarei |
|
| Design of 800m two lane shared accessway to Austroads standards. The project included the selection of appropriate alignment in steep highly incised terrain; geotechnical investigation for assistance with feasibility and costings; appropriate bridging and retaining solutions to minimise environmental impacts; and full horizontal and vertical geometric design using 12D model. |
 |
| Matakana, Rodney District |
|
| Design of 1km of public roading for a 23 lot subdivision in a rural area, zoned countryside living. Designs conform to Rodney District Council and Austroads standards. Report prepared for submission to Local and Regional Councils for Land Use and Discharge and Sediment Control Consents. |
 |
| Park Rise, Campbells Bay |
|
| Subdivision design for difficult topography. The project called for an innovative roading design which allowed for access to building platforms whilst enabling good stormwater management. Design of accessway and two bridge crossings. Contract documentation, tendering and supervision during construction. |
 |